Search results
From RHESSI Wiki
Create the page "Operations" on this wiki!
Page title matches
- Post 2016 Anneal Detector Operations ...of detectors at a time. This page describes the different modes for normal operations, times of high solar activity and campaigns. The document ends with a discu ... Tohban list) and discussion during the 2016 May 18 and 2016 May 25 RHESSI operations meetings.3 KB (507 words) - 20:44, 25 May 2016
- RHESSI has resumed operations |title = RHESSI has resumed operations operations to date.6 KB (982 words) - 13:05, 28 June 2016
Page text matches
- Tohban Report 2008-10-01 == Spacecraft Operations ==1 KB (187 words) - 21:06, 27 February 2013
- Tohban Links *[http://www.isas.jaxa.jp/home/solar/hinode_op/ Hinode operations]3 KB (440 words) - 18:54, 23 June 2012
- Tohban [[Category: Operations]]5 KB (830 words) - 18:57, 28 September 2015
- Main Page * [[:Category:Tohban|Tohban]] (internal RHESSI operations)869 B (124 words) - 22:20, 4 September 2014
- Tohban Useful Routines [[Category: Operations]]12 KB (1,915 words) - 19:57, 13 February 2013
- Ground Stations [[Category: Operations]]315 B (44 words) - 01:17, 23 October 2008
- Passes [[Category: Operations]]549 B (91 words) - 01:18, 23 October 2008
- Roll Angle System For image reconstruction on the ground (no impact on real-time spacecraft operations), knowledge of relative roll is required at all2 KB (260 words) - 17:35, 18 January 2010
- Tohban Report 2008-10-15 == Spacecraft Operations ==910 B (124 words) - 21:09, 27 February 2013
- Tohban Report 2008-10-22 == Spacecraft Operations ==969 B (131 words) - 03:26, 1 March 2013
- Tohban Schedule [[Category: Operations]]270 B (23 words) - 15:20, 15 May 2009
- Tohban Report 2008-10-29 == Spacecraft Operations ==1 KB (154 words) - 03:26, 1 March 2013
- Offpointing [[Category: Operations]]742 B (116 words) - 16:38, 21 November 2008
- Tohban Schedule 2008 [[Category: Operations]]4 KB (503 words) - 23:25, 19 November 2008
- Tohban Schedule 2007 [[Category: Operations]]6 KB (713 words) - 01:13, 23 October 2008
- Tohban Schedule 2006 [[Category: Operations]]7 KB (815 words) - 01:13, 23 October 2008
- Tohban Schedule 2005 [[Category: Operations]]7 KB (807 words) - 01:14, 23 October 2008
- Tohban Schedule 2004 [[Category: Operations]]6 KB (795 words) - 01:14, 23 October 2008
- Tohban Schedule 2003 [[Category: Operations]]6 KB (846 words) - 01:15, 23 October 2008
- Tohban Schedule 2002 [[Category: Operations]]6 KB (780 words) - 01:15, 23 October 2008
- Tohban Report 2008-11-05 == Spacecraft Operations ==2 KB (288 words) - 03:26, 1 March 2013
- Tohban Report 2008-12-03 == Spacecraft Operations ==1 KB (193 words) - 03:28, 1 March 2013
- Solar Cycle 24 Group G ...ade a few flare observations but all are really impressive. Flare mode of operations is involved. XRT has flare mode with a specified cadence, other telescopes === Operations of the IBIS Imaging spectrometer at the DST by G. Cauzzi (INAF) ===16 KB (2,524 words) - 17:43, 18 January 2010
- Solar Cycle 24 Intro ...e. Reduced data from instruments still useful. Updates to the scientific operations include science planning every 2 to 3 days, proposals ([http://www.isas.jax ...ade a few flare observations but all are really impressive. Flare mode of operations is involved. XRT has flare mode with a specified cadence, other telescopes28 KB (4,419 words) - 17:45, 18 January 2010
- Tohban Report 2008-12-24 == Operations ==672 B (102 words) - 03:29, 1 March 2013
- Annealing [[Category: Operations]]2 KB (284 words) - 21:03, 1 May 2014
- Tohban Report 2009-01-14 == Operations ==737 B (109 words) - 03:29, 1 March 2013
- Tohban Schedule 2009 [[Category: Operations]]2 KB (231 words) - 15:21, 15 May 2009
- Tohban Report 2009-01-21 == Spacecraft Operations ==2 KB (234 words) - 03:29, 1 March 2013
- Tohban Report 2009-02-25 == Spacecraft Operations ==966 B (122 words) - 03:31, 1 March 2013
- Tohban Report 2009-03-04 == Spacecraft Operations ==1 KB (171 words) - 03:31, 1 March 2013
- Tohban Report 2009-03-11 == Spacecraft Operations ==1 KB (204 words) - 03:32, 1 March 2013
- Tohban Report 2009-03-18 == Spacecraft Operations ==738 B (102 words) - 03:32, 1 March 2013
- Tohban Report 2009-03-25 == Spacecraft Operations ==1 KB (138 words) - 03:32, 1 March 2013
- Tohban Report 2009-04-01 On 2009-04-02 operations confirms that the data had been replayed.545 B (75 words) - 03:32, 1 March 2013
- Tohban Report 2009-04-15 operations went nominally." We should stay off-pointing for 7-10 days.2 KB (250 words) - 03:33, 1 March 2013
- RHESSI - Concept to Fruition == Operations ==13 KB (1,978 words) - 02:26, 18 September 2018
- Tohban Report 2009-05-20 ...umber of passes as a consequence of the ongoing Shuttle mission and THEMIS operations. == Spacecraft Operations ==831 B (127 words) - 03:35, 1 March 2013
- Tohban Report 2009-05-27 == Spacecraft Operations ==2 KB (334 words) - 03:35, 1 March 2013
- Tohban Report 2009-07-01 == Spacecraft operations == The exact times for these operations are2 KB (293 words) - 03:15, 1 March 2013
- Tohban Report 2009-07-08 == Special Operations ==6 KB (804 words) - 03:16, 1 March 2013
- Tohban Report 2009-07-15 == Special Operations ==3 KB (400 words) - 03:16, 1 March 2013
- Tohban Report 2009-07-22 == Special Operations ==3 KB (457 words) - 03:16, 1 March 2013
- Tohban Report 2009-07-29 == Special Operations ==905 B (133 words) - 03:17, 1 March 2013
- Tohban Report 2009-08-19 == Spacecraft Operations ==635 B (89 words) - 03:18, 1 March 2013
- Tohban Report 2009-12-09 == Special Operations ==702 B (101 words) - 03:22, 1 March 2013
- Tohban Report 2009-08-26 == Spacecraft Operations ==478 B (66 words) - 03:18, 1 March 2013
- RHESSI Visibilities A sequence of basic (linear) operations must be performed on these data to convert them to visibilities. The next s12 KB (1,831 words) - 02:28, 18 September 2018
- Tohban Report 2009-09-30 == Spacecraft Operations ==1 KB (153 words) - 03:19, 1 March 2013
- Tohban Report 2009-10-14 == Spacecraft Operations == ...ominal. Cold plate 2 is at 98.1 K and spin rate is 14.72 rpm. No special operations were performed this week.712 B (101 words) - 03:19, 1 March 2013
- Tohban Report 2009-10-21 == Spacecraft Operations == All operations are nominal. Cold plate 2 is at 97.2 K and spin rate is 14.64 rpm.697 B (102 words) - 03:20, 1 March 2013
- Tohban Report 2009-11-04 In the future, it has been decided that Operations should consult with the tohban before replaying data, if that would cause t3 KB (426 words) - 03:20, 1 March 2013
- Tohban Report 2010-05-12 This week was the first standard operations week since the anomaly that occurred on 16 March 2010. The spacecraft is ge3 KB (464 words) - 08:04, 4 March 2013
- Tohban Report 2009-11-10 == Spacecraft Operations == All operations are nominal. No special operations were performed this week.811 B (102 words) - 03:20, 1 March 2013
- Tohban Report 2009-11-18 == Special Operations ==699 B (96 words) - 03:21, 1 March 2013
- Tohban Report 2009-12-02 == Special Operations ==1 KB (161 words) - 03:22, 1 March 2013
- Tohban Report 2009-11-25 == Special Operations == All operations are nominal. No special operations were performed this week.1 KB (152 words) - 03:22, 1 March 2013
- Cycle 24 has begun operations, because we will anneal the detectors at some optimum time -7 KB (1,123 words) - 17:51, 18 January 2010
- Tohban Report 2010-01-06 == Other Operations Issues ==1 KB (179 words) - 08:01, 4 March 2013
- Tohban Report 2010-01-13 == Other Operations Issues ==1 KB (229 words) - 08:01, 4 March 2013
- Tohban Report 2010-01-20 == Other Operations Issues ==2 KB (252 words) - 08:01, 4 March 2013
- Tohban Report 2010-01-27 == Other Operations Issues ==1 KB (224 words) - 08:01, 4 March 2013
- Tohban Report 2010-03-10 == Operations ==1 KB (210 words) - 19:09, 10 March 2010
- RHESSI's Anneal Adventure The fact that this was totally unplanned made the operations a bit of an adventure, but the results seem to have been very satisfactory. ==The Operations Adventure==10 KB (1,590 words) - 11:26, 18 September 2018
- Tohban Report 2010-05-19 == Operations from a tohban's perspective ==2 KB (258 words) - 18:27, 19 May 2010
- Tohban Report 2010-05-26 The goal is too have a very low SSR fill level when Crab operations start on June 7th.2 KB (296 words) - 08:05, 4 March 2013
- Cloudy SolarSoftware ...umbers correspond to the three steps explained below. Note that all of the operations can be controlled using either GUIs or through the IDL command-line, or, a ... curves, images, spectra, and spectrograms. PLOTMAN provides basic display operations such as zooming, image overlays, solar rotation, etc. To display data with16 KB (2,557 words) - 21:49, 18 November 2010
- Tohban Report 2010-06-09 == Crab Operations == ... a standard readable format for Ops to use. For all those involved in Crab operations, there will be a 1 pm PDT Skype meeting to go over the drill.2 KB (322 words) - 08:06, 4 March 2013
- Tohban Report 2010-06-30 == RHESSI operations ==1 KB (157 words) - 08:06, 4 March 2013
- Tohban Report 2010-07-07 == RHESSI Operations ==1 KB (176 words) - 08:07, 4 March 2013
- Tohban Report 2010-07-21 == Operations ==1 KB (180 words) - 01:16, 7 March 2013
- Tohban Report 2010-08-18 == Operations ==2 KB (261 words) - 01:16, 7 March 2013
- Tohban Report 2010-08-25 == Operations ==2 KB (291 words) - 01:16, 7 March 2013
- Tohban Report 2010-09-01 == Operations ==2 KB (254 words) - 01:18, 7 March 2013
- Tohban Report 2010-09-22 == Operations ==1 KB (217 words) - 01:18, 7 March 2013
- Major Flare Watch Evaluation ...index.html], distributed worldwide to over 200 solar observers and mission operations planners through the self-subscribing MMmotd mailing list and archive7 KB (1,067 words) - 21:08, 10 January 2011
- Tohban Report 2010-11-17 == RHESSI Operations ==1 KB (180 words) - 01:21, 7 March 2013
- Tohban Report 2010-12-08 Because we are loosing 1-2 BGS passes a day to THEMIS/ARTEMIS operations, we are using 2 Waldheim passes/day. This should last until ~Sunday.1 KB (220 words) - 01:23, 7 March 2013
- Tohban Report 2010-12-15 The tohban this week forgot all about the operations meeting, even though he had been keeping an eye on things.2 KB (271 words) - 01:23, 7 March 2013
- Tohban report 2010-12-15 The tohban this week forgot all about the operations meeting, even though he had been keeping an eye on things.2 KB (268 words) - 20:53, 27 February 2013
- Tohban Report 2011-01-12 == RHESSI Operations ==1 KB (149 words) - 01:24, 7 March 2013
- Tohban Report 2011-01-19 == RHESSI Operations ==1 KB (172 words) - 01:25, 7 March 2013
- Tohban Report 2011-02-09 == Spacecraft operations ==1 KB (192 words) - 01:26, 7 March 2013
- Tohban Report 2011-03-09 == RHESSI Operations ==4 KB (614 words) - 01:28, 7 March 2013
- Tohban Report 2011-03-16 == RHESSI Operations ==2 KB (307 words) - 01:28, 7 March 2013
- Tohban Report 2011-03-23 == RHESSI Operations ==2 KB (303 words) - 01:28, 7 March 2013
- Tohban Report 2011-03-30 == RHESSI Operations ==2 KB (297 words) - 01:29, 7 March 2013
- Tohban Report 2011-05-25 == RHESSI Operations ==1 KB (150 words) - 17:20, 17 March 2013
- Tohban Report 2011-06-01 == RHESSI Operations ==1 KB (200 words) - 17:20, 17 March 2013
- Tohban Report 2011-06-08 == RHESSI Operations ==1 KB (197 words) - 17:20, 17 March 2013
- Tohban Report 2011-06-15 == RHESSI Operations ==1 KB (152 words) - 17:20, 17 March 2013
- Tohban Report 2011-06-22 == RHESSI Operations ==1,006 B (146 words) - 17:20, 17 March 2013
- Tohban Report 2011-07-06 ...lipse this week. Passes are reduced from 10 to ~8.5 per day due to shuttle operations and THEMIS. This is expected to continue for the next two weeks. SSR fill l2 KB (282 words) - 17:22, 17 March 2013
- Tohban Report 2011-09-07 == Operations ==2 KB (414 words) - 17:24, 17 March 2013
- Tohban Report 2011-09-28 == RHESSI Operations ==1 KB (212 words) - 17:26, 17 March 2013
- Tohban Report 2011-10-05 == RHESSI Operations ==2 KB (254 words) - 17:26, 17 March 2013
- Tohban Report 2011-10-19 == RHESSI Operations ==861 B (118 words) - 17:26, 17 March 2013
- Tohban Report 2011-10-26 == RHESSI Operations ==832 B (113 words) - 17:26, 17 March 2013
- Tohban Report 2011-11-02 == RHESSI Operations ==963 B (140 words) - 17:27, 17 March 2013
- Tohban Report 2011-12-21 == RHESSI Operations ==1 KB (221 words) - 20:37, 21 December 2011