Search results

From RHESSI Wiki

Jump to: navigation, search

Create the page "Operations" on this wiki!

Page title matches

  • Post 2016 Anneal Detector Operations
    ...of detectors at a time. This page describes the different modes for normal operations, times of high solar activity and campaigns. The document ends with a discu ... Tohban list) and discussion during the 2016 May 18 and 2016 May 25 RHESSI operations meetings.
    3 KB (507 words) - 20:44, 25 May 2016
  • RHESSI has resumed operations
    |title = RHESSI has resumed operations operations to date.
    6 KB (982 words) - 13:05, 28 June 2016

Page text matches

  • Tohban Report 2008-10-01
    == Spacecraft Operations ==
    1 KB (187 words) - 21:06, 27 February 2013
  • Tohban Links
    *[http://www.isas.jaxa.jp/home/solar/hinode_op/ Hinode operations]
    3 KB (440 words) - 18:54, 23 June 2012
  • Tohban
    [[Category: Operations]]
    5 KB (830 words) - 18:57, 28 September 2015
  • Main Page
    * [[:Category:Tohban|Tohban]] (internal RHESSI operations)
    869 B (124 words) - 22:20, 4 September 2014
  • Tohban Useful Routines
    [[Category: Operations]]
    12 KB (1,915 words) - 19:57, 13 February 2013
  • Ground Stations
    [[Category: Operations]]
    315 B (44 words) - 01:17, 23 October 2008
  • Passes
    [[Category: Operations]]
    549 B (91 words) - 01:18, 23 October 2008
  • Roll Angle System
    For image reconstruction on the ground (no impact on real-time spacecraft operations), knowledge of relative roll is required at all
    2 KB (260 words) - 17:35, 18 January 2010
  • Tohban Report 2008-10-15
    == Spacecraft Operations ==
    910 B (124 words) - 21:09, 27 February 2013
  • Tohban Report 2008-10-22
    == Spacecraft Operations ==
    969 B (131 words) - 03:26, 1 March 2013
  • Tohban Schedule
    [[Category: Operations]]
    270 B (23 words) - 15:20, 15 May 2009
  • Tohban Report 2008-10-29
    == Spacecraft Operations ==
    1 KB (154 words) - 03:26, 1 March 2013
  • Offpointing
    [[Category: Operations]]
    742 B (116 words) - 16:38, 21 November 2008
  • Tohban Schedule 2008
    [[Category: Operations]]
    4 KB (503 words) - 23:25, 19 November 2008
  • Tohban Schedule 2007
    [[Category: Operations]]
    6 KB (713 words) - 01:13, 23 October 2008
  • Tohban Schedule 2006
    [[Category: Operations]]
    7 KB (815 words) - 01:13, 23 October 2008
  • Tohban Schedule 2005
    [[Category: Operations]]
    7 KB (807 words) - 01:14, 23 October 2008
  • Tohban Schedule 2004
    [[Category: Operations]]
    6 KB (795 words) - 01:14, 23 October 2008
  • Tohban Schedule 2003
    [[Category: Operations]]
    6 KB (846 words) - 01:15, 23 October 2008
  • Tohban Schedule 2002
    [[Category: Operations]]
    6 KB (780 words) - 01:15, 23 October 2008
  • Tohban Report 2008-11-05
    == Spacecraft Operations ==
    2 KB (288 words) - 03:26, 1 March 2013
  • Tohban Report 2008-12-03
    == Spacecraft Operations ==
    1 KB (193 words) - 03:28, 1 March 2013
  • Solar Cycle 24 Group G
    ...ade a few flare observations but all are really impressive. Flare mode of operations is involved. XRT has flare mode with a specified cadence, other telescopes === Operations of the IBIS Imaging spectrometer at the DST by G. Cauzzi (INAF) ===
    16 KB (2,524 words) - 17:43, 18 January 2010
  • Solar Cycle 24 Intro
    ...e. Reduced data from instruments still useful. Updates to the scientific operations include science planning every 2 to 3 days, proposals ([http://www.isas.jax ...ade a few flare observations but all are really impressive. Flare mode of operations is involved. XRT has flare mode with a specified cadence, other telescopes
    28 KB (4,419 words) - 17:45, 18 January 2010
  • Tohban Report 2008-12-24
    == Operations ==
    672 B (102 words) - 03:29, 1 March 2013
  • Annealing
    [[Category: Operations]]
    2 KB (284 words) - 21:03, 1 May 2014
  • Tohban Report 2009-01-14
    == Operations ==
    737 B (109 words) - 03:29, 1 March 2013
  • Tohban Schedule 2009
    [[Category: Operations]]
    2 KB (231 words) - 15:21, 15 May 2009
  • Tohban Report 2009-01-21
    == Spacecraft Operations ==
    2 KB (234 words) - 03:29, 1 March 2013
  • Tohban Report 2009-02-25
    == Spacecraft Operations ==
    966 B (122 words) - 03:31, 1 March 2013
  • Tohban Report 2009-03-04
    == Spacecraft Operations ==
    1 KB (171 words) - 03:31, 1 March 2013
  • Tohban Report 2009-03-11
    == Spacecraft Operations ==
    1 KB (204 words) - 03:32, 1 March 2013
  • Tohban Report 2009-03-18
    == Spacecraft Operations ==
    738 B (102 words) - 03:32, 1 March 2013
  • Tohban Report 2009-03-25
    == Spacecraft Operations ==
    1 KB (138 words) - 03:32, 1 March 2013
  • Tohban Report 2009-04-01
    On 2009-04-02 operations confirms that the data had been replayed.
    545 B (75 words) - 03:32, 1 March 2013
  • Tohban Report 2009-04-15
    operations went nominally." We should stay off-pointing for 7-10 days.
    2 KB (250 words) - 03:33, 1 March 2013
  • RHESSI - Concept to Fruition
    == Operations ==
    13 KB (1,978 words) - 02:26, 18 September 2018
  • Tohban Report 2009-05-20
    ...umber of passes as a consequence of the ongoing Shuttle mission and THEMIS operations. == Spacecraft Operations ==
    831 B (127 words) - 03:35, 1 March 2013
  • Tohban Report 2009-05-27
    == Spacecraft Operations ==
    2 KB (334 words) - 03:35, 1 March 2013
  • Tohban Report 2009-07-01
    == Spacecraft operations == The exact times for these operations are
    2 KB (293 words) - 03:15, 1 March 2013
  • Tohban Report 2009-07-08
    == Special Operations ==
    6 KB (804 words) - 03:16, 1 March 2013
  • Tohban Report 2009-07-15
    == Special Operations ==
    3 KB (400 words) - 03:16, 1 March 2013
  • Tohban Report 2009-07-22
    == Special Operations ==
    3 KB (457 words) - 03:16, 1 March 2013
  • Tohban Report 2009-07-29
    == Special Operations ==
    905 B (133 words) - 03:17, 1 March 2013
  • Tohban Report 2009-08-19
    == Spacecraft Operations ==
    635 B (89 words) - 03:18, 1 March 2013
  • Tohban Report 2009-12-09
    == Special Operations ==
    702 B (101 words) - 03:22, 1 March 2013
  • Tohban Report 2009-08-26
    == Spacecraft Operations ==
    478 B (66 words) - 03:18, 1 March 2013
  • RHESSI Visibilities
    A sequence of basic (linear) operations must be performed on these data to convert them to visibilities. The next s
    12 KB (1,831 words) - 02:28, 18 September 2018
  • Tohban Report 2009-09-30
    == Spacecraft Operations ==
    1 KB (153 words) - 03:19, 1 March 2013
  • Tohban Report 2009-10-14
    == Spacecraft Operations == ...ominal. Cold plate 2 is at 98.1 K and spin rate is 14.72 rpm. No special operations were performed this week.
    712 B (101 words) - 03:19, 1 March 2013

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)

Personal tools
Namespaces
Variants
Views
Actions
Navigation
Toolbox