Tohban Report 2008-12-24
From RHESSI Wiki
(Difference between revisions)
m (fixed up) |
|||
Line 23: | Line 23: | ||
BGS down on 29th and 30th. RHESSI passes will be mostly at night, so no great loss. Santiago and Weilheim passes have been requested, to take up any slack. We should be covered... | BGS down on 29th and 30th. RHESSI passes will be mostly at night, so no great loss. Santiago and Weilheim passes have been requested, to take up any slack. We should be covered... | ||
- | [[Category:Tohban Report]] | + | [[Category:Tohban Report 2008]] |
[[Category:Tohban]] | [[Category:Tohban]] |
Revision as of 21:16, 27 February 2013
Tohban Reports | |
---|---|
Start Date: | 17 Dec 2008 |
End Date: | 24 Dec 2008 |
Tohban: | Pascal Saint-Hilaire |
Tohban email: | shilaire@ssl.berkeley.edu |
Next Tohban: | M. Fivian |
List all reports |
Contents |
Solar Activity
No solar activity: No sunspots, and nothing reached the A1 level...
Memory Management
Memory at 0% most of the time.
Data Gaps
No datagaps of note (aside from a couple of the oft-seen 600 s VC3 gaps)
Operations
Cold plate up to 96K. BGS down on 29th and 30th. RHESSI passes will be mostly at night, so no great loss. Santiago and Weilheim passes have been requested, to take up any slack. We should be covered...