Search results

From RHESSI Wiki

Jump to: navigation, search

Create the page "Operations" on this wiki!

Page title matches

  • Post 2016 Anneal Detector Operations
    ...of detectors at a time. This page describes the different modes for normal operations, times of high solar activity and campaigns. The document ends with a discu ... Tohban list) and discussion during the 2016 May 18 and 2016 May 25 RHESSI operations meetings.
    3 KB (507 words) - 20:44, 25 May 2016
  • RHESSI has resumed operations
    |title = RHESSI has resumed operations operations to date.
    6 KB (982 words) - 13:05, 28 June 2016

Page text matches

  • Tohban Report 2008-10-01
    == Spacecraft Operations ==
    1 KB (187 words) - 21:06, 27 February 2013
  • Tohban Links
    *[http://www.isas.jaxa.jp/home/solar/hinode_op/ Hinode operations]
    3 KB (440 words) - 18:54, 23 June 2012
  • Tohban
    [[Category: Operations]]
    5 KB (830 words) - 18:57, 28 September 2015
  • Main Page
    * [[:Category:Tohban|Tohban]] (internal RHESSI operations)
    869 B (124 words) - 22:20, 4 September 2014
  • Tohban Useful Routines
    [[Category: Operations]]
    12 KB (1,915 words) - 19:57, 13 February 2013
  • Ground Stations
    [[Category: Operations]]
    315 B (44 words) - 01:17, 23 October 2008
  • Passes
    [[Category: Operations]]
    549 B (91 words) - 01:18, 23 October 2008
  • Roll Angle System
    For image reconstruction on the ground (no impact on real-time spacecraft operations), knowledge of relative roll is required at all
    2 KB (260 words) - 17:35, 18 January 2010
  • Tohban Report 2008-10-15
    == Spacecraft Operations ==
    910 B (124 words) - 21:09, 27 February 2013
  • Tohban Report 2008-10-22
    == Spacecraft Operations ==
    969 B (131 words) - 03:26, 1 March 2013
  • Tohban Schedule
    [[Category: Operations]]
    270 B (23 words) - 15:20, 15 May 2009
  • Tohban Report 2008-10-29
    == Spacecraft Operations ==
    1 KB (154 words) - 03:26, 1 March 2013
  • Offpointing
    [[Category: Operations]]
    742 B (116 words) - 16:38, 21 November 2008
  • Tohban Schedule 2008
    [[Category: Operations]]
    4 KB (503 words) - 23:25, 19 November 2008
  • Tohban Schedule 2007
    [[Category: Operations]]
    6 KB (713 words) - 01:13, 23 October 2008
  • Tohban Schedule 2006
    [[Category: Operations]]
    7 KB (815 words) - 01:13, 23 October 2008
  • Tohban Schedule 2005
    [[Category: Operations]]
    7 KB (807 words) - 01:14, 23 October 2008
  • Tohban Schedule 2004
    [[Category: Operations]]
    6 KB (795 words) - 01:14, 23 October 2008
  • Tohban Schedule 2003
    [[Category: Operations]]
    6 KB (846 words) - 01:15, 23 October 2008
  • Tohban Schedule 2002
    [[Category: Operations]]
    6 KB (780 words) - 01:15, 23 October 2008
  • Tohban Report 2008-11-05
    == Spacecraft Operations ==
    2 KB (288 words) - 03:26, 1 March 2013
  • Tohban Report 2008-12-03
    == Spacecraft Operations ==
    1 KB (193 words) - 03:28, 1 March 2013
  • Solar Cycle 24 Group G
    ...ade a few flare observations but all are really impressive. Flare mode of operations is involved. XRT has flare mode with a specified cadence, other telescopes === Operations of the IBIS Imaging spectrometer at the DST by G. Cauzzi (INAF) ===
    16 KB (2,524 words) - 17:43, 18 January 2010
  • Solar Cycle 24 Intro
    ...e. Reduced data from instruments still useful. Updates to the scientific operations include science planning every 2 to 3 days, proposals ([http://www.isas.jax ...ade a few flare observations but all are really impressive. Flare mode of operations is involved. XRT has flare mode with a specified cadence, other telescopes
    28 KB (4,419 words) - 17:45, 18 January 2010
  • Tohban Report 2008-12-24
    == Operations ==
    672 B (102 words) - 03:29, 1 March 2013
  • Annealing
    [[Category: Operations]]
    2 KB (284 words) - 21:03, 1 May 2014
  • Tohban Report 2009-01-14
    == Operations ==
    737 B (109 words) - 03:29, 1 March 2013
  • Tohban Schedule 2009
    [[Category: Operations]]
    2 KB (231 words) - 15:21, 15 May 2009
  • Tohban Report 2009-01-21
    == Spacecraft Operations ==
    2 KB (234 words) - 03:29, 1 March 2013
  • Tohban Report 2009-02-25
    == Spacecraft Operations ==
    966 B (122 words) - 03:31, 1 March 2013
  • Tohban Report 2009-03-04
    == Spacecraft Operations ==
    1 KB (171 words) - 03:31, 1 March 2013
  • Tohban Report 2009-03-11
    == Spacecraft Operations ==
    1 KB (204 words) - 03:32, 1 March 2013
  • Tohban Report 2009-03-18
    == Spacecraft Operations ==
    738 B (102 words) - 03:32, 1 March 2013
  • Tohban Report 2009-03-25
    == Spacecraft Operations ==
    1 KB (138 words) - 03:32, 1 March 2013
  • Tohban Report 2009-04-01
    On 2009-04-02 operations confirms that the data had been replayed.
    545 B (75 words) - 03:32, 1 March 2013
  • Tohban Report 2009-04-15
    operations went nominally." We should stay off-pointing for 7-10 days.
    2 KB (250 words) - 03:33, 1 March 2013
  • RHESSI - Concept to Fruition
    == Operations ==
    13 KB (1,978 words) - 02:26, 18 September 2018
  • Tohban Report 2009-05-20
    ...umber of passes as a consequence of the ongoing Shuttle mission and THEMIS operations. == Spacecraft Operations ==
    831 B (127 words) - 03:35, 1 March 2013
  • Tohban Report 2009-05-27
    == Spacecraft Operations ==
    2 KB (334 words) - 03:35, 1 March 2013
  • Tohban Report 2009-07-01
    == Spacecraft operations == The exact times for these operations are
    2 KB (293 words) - 03:15, 1 March 2013
  • Tohban Report 2009-07-08
    == Special Operations ==
    6 KB (804 words) - 03:16, 1 March 2013
  • Tohban Report 2009-07-15
    == Special Operations ==
    3 KB (400 words) - 03:16, 1 March 2013
  • Tohban Report 2009-07-22
    == Special Operations ==
    3 KB (457 words) - 03:16, 1 March 2013
  • Tohban Report 2009-07-29
    == Special Operations ==
    905 B (133 words) - 03:17, 1 March 2013
  • Tohban Report 2009-08-19
    == Spacecraft Operations ==
    635 B (89 words) - 03:18, 1 March 2013
  • Tohban Report 2009-12-09
    == Special Operations ==
    702 B (101 words) - 03:22, 1 March 2013
  • Tohban Report 2009-08-26
    == Spacecraft Operations ==
    478 B (66 words) - 03:18, 1 March 2013
  • RHESSI Visibilities
    A sequence of basic (linear) operations must be performed on these data to convert them to visibilities. The next s
    12 KB (1,831 words) - 02:28, 18 September 2018
  • Tohban Report 2009-09-30
    == Spacecraft Operations ==
    1 KB (153 words) - 03:19, 1 March 2013
  • Tohban Report 2009-10-14
    == Spacecraft Operations == ...ominal. Cold plate 2 is at 98.1 K and spin rate is 14.72 rpm. No special operations were performed this week.
    712 B (101 words) - 03:19, 1 March 2013
  • Tohban Report 2009-10-21
    == Spacecraft Operations == All operations are nominal. Cold plate 2 is at 97.2 K and spin rate is 14.64 rpm.
    697 B (102 words) - 03:20, 1 March 2013
  • Tohban Report 2009-11-04
    In the future, it has been decided that Operations should consult with the tohban before replaying data, if that would cause t
    3 KB (426 words) - 03:20, 1 March 2013
  • Tohban Report 2010-05-12
    This week was the first standard operations week since the anomaly that occurred on 16 March 2010. The spacecraft is ge
    3 KB (464 words) - 08:04, 4 March 2013
  • Tohban Report 2009-11-10
    == Spacecraft Operations == All operations are nominal. No special operations were performed this week.
    811 B (102 words) - 03:20, 1 March 2013
  • Tohban Report 2009-11-18
    == Special Operations ==
    699 B (96 words) - 03:21, 1 March 2013
  • Tohban Report 2009-12-02
    == Special Operations ==
    1 KB (161 words) - 03:22, 1 March 2013
  • Tohban Report 2009-11-25
    == Special Operations == All operations are nominal. No special operations were performed this week.
    1 KB (152 words) - 03:22, 1 March 2013
  • Cycle 24 has begun
    operations, because we will anneal the detectors at some optimum time -
    7 KB (1,123 words) - 17:51, 18 January 2010
  • Tohban Report 2010-01-06
    == Other Operations Issues ==
    1 KB (179 words) - 08:01, 4 March 2013
  • Tohban Report 2010-01-13
    == Other Operations Issues ==
    1 KB (229 words) - 08:01, 4 March 2013
  • Tohban Report 2010-01-20
    == Other Operations Issues ==
    2 KB (252 words) - 08:01, 4 March 2013
  • Tohban Report 2010-01-27
    == Other Operations Issues ==
    1 KB (224 words) - 08:01, 4 March 2013
  • Tohban Report 2010-03-10
    == Operations ==
    1 KB (210 words) - 19:09, 10 March 2010
  • RHESSI's Anneal Adventure
    The fact that this was totally unplanned made the operations a bit of an adventure, but the results seem to have been very satisfactory. ==The Operations Adventure==
    10 KB (1,590 words) - 11:26, 18 September 2018
  • Tohban Report 2010-05-19
    == Operations from a tohban's perspective ==
    2 KB (258 words) - 18:27, 19 May 2010
  • Tohban Report 2010-05-26
    The goal is too have a very low SSR fill level when Crab operations start on June 7th.
    2 KB (296 words) - 08:05, 4 March 2013
  • Cloudy SolarSoftware
    ...umbers correspond to the three steps explained below. Note that all of the operations can be controlled using either GUIs or through the IDL command-line, or, a ... curves, images, spectra, and spectrograms. PLOTMAN provides basic display operations such as zooming, image overlays, solar rotation, etc. To display data with
    16 KB (2,557 words) - 21:49, 18 November 2010
  • Tohban Report 2010-06-09
    == Crab Operations == ... a standard readable format for Ops to use. For all those involved in Crab operations, there will be a 1 pm PDT Skype meeting to go over the drill.
    2 KB (322 words) - 08:06, 4 March 2013
  • Tohban Report 2010-06-30
    == RHESSI operations ==
    1 KB (157 words) - 08:06, 4 March 2013
  • Tohban Report 2010-07-07
    == RHESSI Operations ==
    1 KB (176 words) - 08:07, 4 March 2013
  • Tohban Report 2010-07-21
    == Operations ==
    1 KB (180 words) - 01:16, 7 March 2013
  • Tohban Report 2010-08-18
    == Operations ==
    2 KB (261 words) - 01:16, 7 March 2013
  • Tohban Report 2010-08-25
    == Operations ==
    2 KB (291 words) - 01:16, 7 March 2013
  • Tohban Report 2010-09-01
    == Operations ==
    2 KB (254 words) - 01:18, 7 March 2013
  • Tohban Report 2010-09-22
    == Operations ==
    1 KB (217 words) - 01:18, 7 March 2013
  • Major Flare Watch Evaluation
    ...index.html], distributed worldwide to over 200 solar observers and mission operations planners through the self-subscribing MMmotd mailing list and archive
    7 KB (1,067 words) - 21:08, 10 January 2011
  • Tohban Report 2010-11-17
    == RHESSI Operations ==
    1 KB (180 words) - 01:21, 7 March 2013
  • Tohban Report 2010-12-08
    Because we are loosing 1-2 BGS passes a day to THEMIS/ARTEMIS operations, we are using 2 Waldheim passes/day. This should last until ~Sunday.
    1 KB (220 words) - 01:23, 7 March 2013
  • Tohban Report 2010-12-15
    The tohban this week forgot all about the operations meeting, even though he had been keeping an eye on things.
    2 KB (271 words) - 01:23, 7 March 2013
  • Tohban report 2010-12-15
    The tohban this week forgot all about the operations meeting, even though he had been keeping an eye on things.
    2 KB (268 words) - 20:53, 27 February 2013
  • Tohban Report 2011-01-12
    == RHESSI Operations ==
    1 KB (149 words) - 01:24, 7 March 2013
  • Tohban Report 2011-01-19
    == RHESSI Operations ==
    1 KB (172 words) - 01:25, 7 March 2013
  • Tohban Report 2011-02-09
    == Spacecraft operations ==
    1 KB (192 words) - 01:26, 7 March 2013
  • Tohban Report 2011-03-09
    == RHESSI Operations ==
    4 KB (614 words) - 01:28, 7 March 2013
  • Tohban Report 2011-03-16
    == RHESSI Operations ==
    2 KB (307 words) - 01:28, 7 March 2013
  • Tohban Report 2011-03-23
    == RHESSI Operations ==
    2 KB (303 words) - 01:28, 7 March 2013
  • Tohban Report 2011-03-30
    == RHESSI Operations ==
    2 KB (297 words) - 01:29, 7 March 2013
  • Tohban Report 2011-05-25
    == RHESSI Operations ==
    1 KB (150 words) - 17:20, 17 March 2013
  • Tohban Report 2011-06-01
    == RHESSI Operations ==
    1 KB (200 words) - 17:20, 17 March 2013
  • Tohban Report 2011-06-08
    == RHESSI Operations ==
    1 KB (197 words) - 17:20, 17 March 2013
  • Tohban Report 2011-06-15
    == RHESSI Operations ==
    1 KB (152 words) - 17:20, 17 March 2013
  • Tohban Report 2011-06-22
    == RHESSI Operations ==
    1,006 B (146 words) - 17:20, 17 March 2013
  • Tohban Report 2011-07-06
    ...lipse this week. Passes are reduced from 10 to ~8.5 per day due to shuttle operations and THEMIS. This is expected to continue for the next two weeks. SSR fill l
    2 KB (282 words) - 17:22, 17 March 2013
  • Tohban Report 2011-09-07
    == Operations ==
    2 KB (414 words) - 17:24, 17 March 2013
  • Tohban Report 2011-09-28
    == RHESSI Operations ==
    1 KB (212 words) - 17:26, 17 March 2013
  • Tohban Report 2011-10-05
    == RHESSI Operations ==
    2 KB (254 words) - 17:26, 17 March 2013
  • Tohban Report 2011-10-19
    == RHESSI Operations ==
    861 B (118 words) - 17:26, 17 March 2013
  • Tohban Report 2011-10-26
    == RHESSI Operations ==
    832 B (113 words) - 17:26, 17 March 2013
  • Tohban Report 2011-11-02
    == RHESSI Operations ==
    963 B (140 words) - 17:27, 17 March 2013
  • Tohban Report 2011-12-21
    == RHESSI Operations ==
    1 KB (221 words) - 20:37, 21 December 2011
  • Tohban Report 2011-12-28
    == RHESSI Operations ==
    2 KB (347 words) - 20:57, 28 December 2011
  • Flare Observations of the EUV Continua
    The reduced operations minimize instrument degradation. However, for one or two days per month, pa
    7 KB (1,164 words) - 17:14, 22 August 2018
  • Tohban Report 2012-02-08
    == RHESSI Operations ==
    1 KB (207 words) - 01:18, 19 March 2013
  • Tohban Report 2012-02-15
    == RHESSI Operations ==
    1 KB (170 words) - 01:18, 19 March 2013
  • Tohban Report 2012-02-22
    == Operations ==
    2 KB (248 words) - 01:18, 19 March 2013
  • Tohban Report 2012-03-14
    == RHESSI Operations == During this week operations were dominated by the activation of functions disabled during the high SSR
    3 KB (515 words) - 01:18, 19 March 2013
  • Tohban Report 2012-03-21
    == RHESSI Operations ==
    2 KB (233 words) - 01:20, 19 March 2013
  • Tohban Report 2012-03-28
    == RHESSI Operations ==
    2 KB (248 words) - 01:20, 19 March 2013
  • Tohban Report 2012-04-04
    The SSR accidentally reached 100% due to a special commanding event (see Operations section below). The SSR filled completely at 1115 UT on April 4, 2012. At == RHESSI Operations ==
    3 KB (557 words) - 01:20, 19 March 2013
  • Tohban Report 2012-05-02
    == RHESSI Operations ==
    4 KB (471 words) - 01:20, 19 March 2013
  • Tohban Report 2012-05-09
    == RHESSI Operations ==
    2 KB (345 words) - 01:26, 19 March 2013
  • Tohban Report 2012-06-20
    == RHESSI Operations ==
    2 KB (265 words) - 17:11, 21 March 2013
  • Tohban Report 2012-11-07
    ...ors 2, 4 and 8 for issues/noise that might arise as a result of this weeks operations. If raising the detector 2 slow threshold hels lower the SSR fill level the | Detector problems? || Operations to det 2, 4 and 8, see above for details.
    3 KB (467 words) - 17:30, 21 March 2013
  • Tohban Report 2013-01-09
    ...ying at the en of the daily passes during the beginning of the week. After operations the SSR fill level was between 7 and 25%.
    3 KB (477 words) - 20:27, 27 August 2014
  • Tohban Report 2013-01-16
    Due to the Major Flare Watch, operations to raise the detector 2 HV were postponed until the region decays and there
    3 KB (419 words) - 20:28, 27 August 2014
  • Tohban Report 2013-01-23
    No detector operations were performed this week, due to odd pass times and the temporary issue wit
    3 KB (407 words) - 20:28, 27 August 2014
  • Tohban Report 2013-01-30
    ...ying at the en of the daily passes during the beginning of the week. After operations the SSR fill level was between 0 and 25%.
    2 KB (264 words) - 20:29, 27 August 2014
  • Log for tohban anomalies
    ...eeds to deal with. This page is meant to serve as a record for spacecraft operations, parameters, etc that were out of the ordinary in case that same event happ
    3 KB (609 words) - 15:59, 26 August 2015
  • Tohban Report 2013-04-10
    ...ying at the en of the daily passes during the beginning of the week. After operations the SSR fill level was between 0 and 27%.
    2 KB (245 words) - 20:31, 27 August 2014
  • Tohban Report 2014-06-11
    No operations this week
    3 KB (433 words) - 19:15, 13 August 2015
  • Tohban Report 2013-10-02
    No operations this week
    2 KB (213 words) - 22:21, 4 September 2014
  • Tohban Report 2013-10-09
    No operations this week
    2 KB (278 words) - 22:21, 4 September 2014
  • Tohban Report 2013-10-16
    No operations this week
    3 KB (446 words) - 22:21, 4 September 2014
  • Tohban Report 2014-01-02
    No operations this week
    2 KB (240 words) - 18:37, 13 August 2015
  • Tohban Report 2014-02-05
    No operations this week
    2 KB (307 words) - 18:46, 13 August 2015
  • Tohban Report 2014-02-12
    No operations this week
    3 KB (448 words) - 19:06, 13 August 2015
  • Tohban Report 2014-02-19
    No operations this week
    3 KB (406 words) - 19:07, 13 August 2015
  • Tohban Report 2014-02-26
    No operations this week
    3 KB (445 words) - 19:08, 13 August 2015
  • Tohban Report 2014-06-03
    No operations this week
    3 KB (493 words) - 19:15, 13 August 2015
  • Tohban Report 2014-05-14
    No operations this week
    2 KB (356 words) - 19:14, 13 August 2015
  • Tohban Report 2014-07-02
    == Spacecraft Operations ==
    2 KB (259 words) - 19:22, 13 August 2015
  • RHESSI is Annealing Now
    Normal operations will begin in mid-August and in the meanwhile, the RHESSI team was hoping t
    4 KB (677 words) - 02:41, 18 September 2018
  • Tohban Report 2014-07-09
    == Spacecraft Operations == ...or (c) power cycling the cooler helped. It is possible that the commanded operations had a beneficial effect, but it is also possible that the piston and displa
    3 KB (558 words) - 19:22, 13 August 2015
  • Tohban Report 2014-07-16
    == Spacecraft Operations ==
    2 KB (294 words) - 19:22, 13 August 2015
  • Tohban Report 2014-07-23
    == Spacecraft Operations ==
    3 KB (410 words) - 19:23, 13 August 2015
  • Tohban Report 2014-07-30
    == Spacecraft Operations ==
    3 KB (347 words) - 19:23, 13 August 2015
  • Tohban Report 2014-08-06
    == Spacecraft Operations ==
    3 KB (377 words) - 19:23, 13 August 2015
  • Tohban Report 2014-08-13
    The cooldown procedure was completed on August 11 2014 and the operations team managed to get the cold plate back to basically the same temperature r
    3 KB (381 words) - 19:24, 13 August 2015
  • Tohban Report 2014-08-20
    == Spacecraft Operations ==
    2 KB (230 words) - 19:25, 13 August 2015
  • Tohban Report 2014-08-27
    == Spacecraft Operations ==
    5 KB (744 words) - 19:25, 13 August 2015
  • Tohban Report 2014-09-03
    == Spacecraft Operations ==
    3 KB (469 words) - 19:25, 13 August 2015
  • Tohban Report 2014-09-10
    == Spacecraft Operations ==
    3 KB (439 words) - 19:26, 13 August 2015
  • Tohban Report 2014-09-16
    == Spacecraft Operations ==
    4 KB (500 words) - 19:26, 13 August 2015
  • Tohban Report 2014-09-24
    == Spacecraft Operations ==
    3 KB (402 words) - 19:26, 13 August 2015
  • Tohban Report 2014-10-01
    == Spacecraft Operations ==
    2 KB (266 words) - 19:27, 13 August 2015
  • Tohban Report 2014-10-08
    == Spacecraft Operations ==
    2 KB (342 words) - 19:27, 13 August 2015
  • Tohban Report 2014-10-15
    == Spacecraft Operations ==
    3 KB (406 words) - 19:28, 13 August 2015
  • Tohban Report 2014-10-22
    == Spacecraft Operations ==
    3 KB (420 words) - 19:28, 13 August 2015
  • Tohban Report 2014-10-29
    == Spacecraft Operations ==
    2 KB (383 words) - 19:28, 13 August 2015
  • Tohban Report 2014-11-05
    == Spacecraft Operations ==
    3 KB (462 words) - 19:29, 13 August 2015
  • Tohban Report 2014-11-12
    == Spacecraft Operations ==
    2 KB (297 words) - 19:29, 13 August 2015
  • Tohban Report 2014-11-19
    == Spacecraft Operations ==
    2 KB (294 words) - 19:29, 13 August 2015
  • Tohban Report 2014-11-26
    == Spacecraft Operations ==
    2 KB (327 words) - 19:30, 13 August 2015
  • Tohban Report 2014-12-03
    == Spacecraft Operations ==
    3 KB (410 words) - 19:30, 13 August 2015
  • Tohban Report 2014-12-10
    == Spacecraft Operations ==
    2 KB (252 words) - 19:31, 13 August 2015
  • Tohban Report 2014-12-17
    == Spacecraft Operations ==
    2 KB (235 words) - 19:31, 13 August 2015
  • RHESSI Science Nuggets 200 to 299
    |title = RHESSI has resumed operations
    28 KB (3,638 words) - 14:45, 25 January 2018
  • Tohban Report 2015-10-07
    ...nd Thick Out thresholds fairly aggressively, to get back to normal shutter operations
    7 KB (1,061 words) - 22:30, 7 October 2015
  • When the Earth’s atmosphere becomes dynamic…
    ...ogress in space weather understanding and applications regarding satellite operations.
    7 KB (977 words) - 11:24, 19 February 2016
  • RHESSI's 5th Anneal
    ...ESSI is Annealing Now| fourth anneal]], 2014; and its [[RHESSI has resumed operations| conclusion]]. We will issue another Nugget when operations resume.
    3 KB (409 words) - 15:51, 18 September 2018
  • Post 2016 Anneal Detector Operations
    ...of detectors at a time. This page describes the different modes for normal operations, times of high solar activity and campaigns. The document ends with a discu ... Tohban list) and discussion during the 2016 May 18 and 2016 May 25 RHESSI operations meetings.
    3 KB (507 words) - 20:44, 25 May 2016
  • RHESSI has resumed operations
    |title = RHESSI has resumed operations operations to date.
    6 KB (982 words) - 13:05, 28 June 2016
  • Tohban Report 2017-06-14
    No detector issues nor operations last week to report.
    2 KB (268 words) - 15:54, 14 June 2017
  • Tohban Report 2017-07-19
    ...ctors 1, 3, 6, and 8 are powered on, and are recording events. No detector operations this week.
    3 KB (437 words) - 20:37, 19 July 2017
  • Tohban Report 2017-07-26
    ...ctors 1, 3, 6, and 8 are powered on, and are recording events. No detector operations this week.
    2 KB (327 words) - 18:25, 26 July 2017
  • Tohban Report 2017-08-02
    ...ctors 1, 3, 6, and 8 are powered on, and are recording events. No detector operations this week.
    2 KB (333 words) - 20:34, 3 August 2017
  • Tohban Report 2017-08-09
    ...ctors 1, 3, 6, and 8 are powered on, and are recording events. No detector operations this week.
    3 KB (388 words) - 18:36, 9 August 2017
  • Annealing RHESSI for the first time
    ... [http://sci.esa.int/integral/ Integral], benefited from routine annealing operations.
    5 KB (763 words) - 11:29, 18 September 2018
  • Tohban Report 2018-02-14
    ...eek. The attenuator threshold was set to XXX last Wednesday. The following operations were done that day:
    3 KB (461 words) - 19:29, 14 February 2018
  • Tohban Report 2018-07-11
    ...ons appear to show that commanding is not going to be possible for ongoing operations. A plan to decommission the spacecraft have been enacted. The MOC will cont
    2 KB (258 words) - 17:45, 18 July 2018
  • The Interesting RHESSI/SAS Archive
    operations evolved.
    7 KB (1,192 words) - 10:35, 23 January 2019
  • Hard X-ray Pulsations via Gaussian Decomposition
    year of Solar Orbiter science operations. operations.
    6 KB (841 words) - 11:03, 14 February 2023
  • TeV Gamma rays from the Quiescent Sun
    It has also been taking data from the Sun since beginning operations
    4 KB (607 words) - 07:03, 8 September 2023

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)

Personal tools
Namespaces
Variants
Views
Actions
Navigation
Toolbox